logo

Cement Blanket for Muddy Road Paving - Quick-Drying, Wear-Resistant Temporary & Permanent Road Solution

80㎡
MOQ
Inquire anytime
harga
Cement Blanket for Muddy Road Paving - Quick-Drying, Wear-Resistant Temporary & Permanent Road Solution
fitur Galeri Deskripsi Produk Quote request suatu
fitur
Spesifikasi
Bahan: Serat tekstil dan bubuk semen
Lebar: 4m
Panjang: 20m-50m
Menyoroti:

quick-drying cement blanket

,

wear-resistant temporary road solution

,

permanent road paving cement blanket

Informasi dasar
Tempat asal: Cina
Nama merek: JIANYI
Sertifikasi: ISO9001
Syarat-syarat pembayaran & pengiriman
Kemasan rincian: Kemasan luar tahan air dan debu
Waktu pengiriman: 5-8 hari kerja
Syarat-syarat pembayaran: T/T
Menyediakan kemampuan: 600t/bulan
Deskripsi Produk
Cement Blanket for Muddy Road Paving
Product Overview

Our Cement Blanket is a high-strength, wear-resistant paving solution designed to transform muddy, impassable roads into stable, drivable surfaces quickly. Engineered with a reinforced fiberglass base and high-density cement core, this innovative material hardens rapidly upon water application to create a rigid road surface with exceptional load-bearing capacity.

Key Performance: Supports vehicles up to 5-10 tons after full curing
Application Scenarios

This versatile road paving solution is ideal for multiple applications where stable surfaces are essential:

  • Rural muddy road improvement and maintenance
  • Construction site temporary access roads
  • Farmland and agricultural access roads
  • Emergency road construction in disaster-stricken areas

The cement blanket effectively resolves road impassability issues caused by rain, snow, or heavy usage, ensuring reliable transportation of agricultural products, construction materials, and emergency supplies. Suitable for both temporary applications and permanent road improvements with proper edge reinforcement.

Construction Process
1 Road Preparation: Clear the muddy road surface, remove stagnant water, and level the roadbed. Fill potholes with soil or gravel as needed for a stable foundation.
2 Unfolding & Paving: Roll out the cement blanket along the road direction, ensuring complete coverage of the road width. Overlap adjacent sheets by 15-20cm and secure edges with steel nails or gravel piles.
3 Hydration: Spray or pour water evenly across the blanket until fully saturated. Use sprinklers for efficient coverage on large areas.
4 Curing: Allow the road to dry for 24-36 hours. Light vehicles can pass after initial curing, with full load-bearing capacity achieved within 7 days. For permanent applications, consider adding a gravel or asphalt top layer as needed.
Rekomendasi Produk
Hubungi kami
Kontak Person : Ms. Zhang
Tel : 86-13332517898
Karakter yang tersisa(20/3000)